Request a Quote
Send us your part
No form to fill in. Email us directly with your drawing and roughly how many you need, and a real person here comes back with a specific answer — usually within one business day.
Email us your projector copy tiger@fudakint.comWhat to include
None of this is mandatory. Send what you have and we will ask about the rest — but the more of it that arrives in the first email, the closer the first reply gets to a real number.
- A drawing, model, or photo — A STEP or IGES file is ideal. A 2D drawing works. So does a photo of the part or a sketch on paper — we have quoted from all three.
- How many you need — A prototype, a first run of 500, or 50,000 a year. The number changes which process makes sense, so a rough figure is more useful than none.
- Your target price, if you have one — Telling us the number you need to hit is not weakness — it is the fastest way to find out whether material or process changes can get you there.
- When you need it — Production lead times generally run 30–45 days once tooling exists. Tooling itself takes longer. Knowing your date shapes the answer.
- Anything that has already gone wrong — If another supplier turned the part down or the last run came back wrong, tell us. That is usually the most useful thing in the email.
What happens after you send it
An engineer reads it, not a sales inbox. If the part is a fit, you get questions about material, tolerance, and finish — the specific ones that decide cost. If it is not a fit, we say so and tell you why, rather than quoting high to make it go away.
If tooling is involved, the honest first question is what the mold costs and whether you can fund it. We answer that before anything else, because it is the number that actually decides whether a first order is possible. See what a mold costs and who owns it →
Where the work runs
Shenzhen covers the full range — CNC machining, injection molding, mold making, stamping, die casting, finishing, and assembly, under one roof. Bangkok runs injection molding, warehousing, and assembly, and exists for customers who need production outside China. Say in your email if the country matters to you and we will tell you plainly which site fits.
Ready when you are
Attach whatever you have and hit send. If your files are large, send the email first and we will reply with somewhere to upload them.
Email tiger@fudakint.comor copy tiger@fudakint.com